Package: | Meet clients' demand; | Type: | Forging/Casting; |
Packaging Detail: | meet client's demand; | Applicable Industries: | Construction works ; |
Warranty: | 1 Year; | Color: | Customer's Request; |
Product Name: | Elbow; | Port: | qingdao; |
Weight: | 15kg; | Material: | Mn13; |
Payment Methods: | T/T; | Brand Name: | S.M.L; |
Payment Terms: | L/C,T/T; | Delivery Time: | 7-15days; |
Supply Ability: | 1000 Piece/Pieces per Day; | Place of Origin: | Shandong China; |
Type | Part No. | Specification | Working pressure |
ST52 Steel pipe | ST4453 | DN100*4.5MM*3M*SK100 4-1/2'' | 85bar |
ST5453 | DN125*4.5MM*3M*SK125 5-1/2'' | 85bar | |
ST5503 | DN125*5.0MM*3M*SK125 5-1/2'' | 85bar | |
ST5603 | DN125*6.0MM*3M*SK125 5-1/2'' Insert Hardened Liner | 85bar | |
shchwing M/F Pipe | M/F5453 | DN125*4.5MM*3M*MF125 5'' | 130bar |
M/F5503 | DN125*5.0MM*3M*MF125 5'' | 130bar | |
M/F5603 | DN125*6.0MM*3M*MF125 5'' | 130bar | |
Putzmeister ZX Pipe | ZX5403 | DN125*4.5MM*3M*ZX125 5'' | 130bar |
ZX5503 | DN125*5.0MM*3M*ZX125 5'' | 130bar | |
ZX5603 | DN125*6.0MM*3M*ZX125 5'' | 130bar | |
Hardened Pipe | HP5453 | DN125*4.5MM*3M*SK125 5-1/2''(twin flanges) | 85bar |
HP5483 | DN125*4.8MM*3M*SK125 5-1/2''(twin flanges) | 85bar | |
HP5503 | DN125*4.8MM*3M*SK125 5-1/2''(twin flanges) | 85bar | |
Twin Wall Pipe | TW5453 | DN125*(2.5+2)MM*3M*SK125-1/2(two layer flanges) | 85bar |
TW5503 | DN125*(3+2)MM*3M*SK125-1/2(two layer flanges) | 85bar | |
TW5703 | DN125*(5+2)MM*3M*SK125-1/2(two layer flanges) | 85bar |
Shandong Dongju Trade Co,.Ltd was founded in 1995, and since 2003 has become one of the leading manufacturers of concrete pump parts in China, our company has today's first-class rubber hose manufacturing technology, the production of concrete pump hose, installed special hose occupy a wide range of the market and enjoy a good reputation.
Our main products as following:
1. Special rubber hose for concrete pumping, special rubber hose for pipe machine and fine stone mortar pump.
2. Wear resistant straight pipe, elbow pipe, reducing pipe, pipe clamp, etc.
3. Piston seals, rubber rings, cleaning balls, etc.
4. Wear plate, cutting ring, various concrete pump wearing parts, etc.
1.Q: Are you a trading company or manufacturer?
A: Our company is a professional concrete pump parts manufacturer and in this field for nearly 20 years.
2.Q:How long is your delivery time?
A: 7-15 days after receiving the deposition by T/T.
3.Q: Can you provide the samples , is it free or not ?
A: Yes, we could offer the samples. But, the clients need to pay the fee.
4.Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before the shipment.