Mould Leadtime: | 4 weeks; | Place of Origin: | Guangdong China; |
Payment Terms: | L/C,T/T; | Application: | Truck; |
Production Leadtime: | 4 weeks; | Model Number: | OEM; |
drawing: | igs, stp, x_t , dwg, pdf file; | Process: | Die casting + Drill&Mill + Powder Coat; |
Finish: | Powder Coat; | Port: | HK or Shenzhen; |
Brand Name: | Runpeng; | Cavity: | Single or Multiple; |
Supply Ability: | 50000 Piece/Pieces per Month; | Product name: | Aluminum Die Casting Parts China Supply Truck Spare Parts; |
Software: | CAD, UG, Pro/E etc; | Material: | ADC12, A380, A356 or A413; |
Packaging Detail: | single protective + Carton + Pallet; |
Aluminum Die Casting Parts China Supply Truck Spare Parts
More than 23 YEARS experience in manufacturing Mould, die casting,stamping,CNC machining,extrusion and plastic injection moulding parts.
Our Advantage:
1. We are a professional OEM manufacturer.
2. We have experienced engineers and quality control team as our strong backing.
3. High quality, competitive price, quick response is our mission.
4. Professional technical support
5. Good delivery time
6. Strict quality control process
7. Cost-Effective
8. Rich experience in mould design and production.
9. ISO/ERP system guarantee.
Our equipments:
Mould making machines | Thread-cutting machine | 3 |
Large hydro-static grinding machining | 1 | |
Small grinding machining | 1 | |
Miling machine,tower | 3 | |
Lathes | 3 | |
Electric Discharge Machine | 1 | |
Roling rivet machine | 1 | |
Magnetic weld machine | 6 | |
cutting machines | 1 | |
Drilling machines,radial | 1 | |
Die casting machines | 150T-800T die casting machine | 10 |
Machining machines | CNC machine | 8 |
Numerical-controlled Lathe | 8 | |
Drilling & tapping machine | 36 | |
Lathes,horizontal | 10 | |
Driling-machines,multi-spindle | 1 | |
Milling machines,vertical | 2 | |
Punching machines | 15T-120T pouch | 10 |
Bending machine | 2 | |
Shearing machine | 2 | |
CNC Punching machine | 1 | |
Injection Moulding machines | 80-400T Injection machine| | 8 |
Inspection equipments | CMM | 2 |
Pneumatic ID measuring head & counter gauge | 1 | |
Callipers | 30 | |
Altitude gauge | 2 | |
Hardness Gauge | 2 | |
Thread gauge | 30 | |
Salt spray test machine | 1 | |
Constant temperature and humidity machine | 1 | |
Thermal Shock Test Chamber | 1 |
Shenzhen Runpeng Precision Hardware Co., Ltd. Was found in 1994, we are located in Shenzhen City, Guangdong Province.Our company specializes in mould production, zinc & aluminum alloy die-casting, stamping, CNC machining, CNC punching and plastics Injection. We have a total 212 employees.
We are the strategic partner of many companies associated to the World Top 500 companies, Our key customers include Allied Motion, Emerson, Sumsung, Simens, Seagate. and so on.
Our company is fully equipped with various high quality machinery, which includes die casting machines, Injection Machines, CNC milling machines, numerically controlled lathes, stamping machines, CNC punching machines, CNC production centers, drill & tapping machines, wire cut machines, wet grinding mills, welding machines and and other ancillary production equipment.
FAQ
Q1. Are you a factory or trade company?
We are a factory located in 69&70 Buildings, 4th industrial zone, Gongming town, Guangming new district , Shenzhen, China. Welcome to visit our factory
Q2. What kind of production service do you provide?
mould making, die casting, CNC machining, stamping, Plastics injection moulding, simple assembly and various metal surface treatment.
Q3. How about the lead time?
Mould : 3-5 weeks
Mass production : 3-4 weeks
Q4. How about your quality?
♦Our management and production executed strictly according to ISO9001 : 2008 quality System.
♦We will make the operation instruction once the sample is approval.
♦ We will 100% inspect the products before shipment.
♦If there is quality problem, we will supply the replacement by our shipping cost.
Q5. How long should we take for a quotation?
After receiving detail information we will quote within 2 days.
Q6. What is your quotation element?
Drawing or Sample, Material, finish and Quantity.
Q7. What is your payment term?
Mould : 30% prepaid, 40% after the mould finish, balance after sample approval.
Goods : 30% prepaid, balance T/T before shipment.