Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram; | Port: | Shenzhen; |
Model Number: | Stirling engine model; | Product name: | Stirling engine model; |
Tolerance: | 0.001-0.005mm or Customized; | Service: | OEM,ODM,Standard; |
Supply Ability: | 652355555 Carton/Cartons per Month; | Surface finish: | Sand Blasting, Polishing, Anodize, Zinc/Nickel/Chrome/ Plating; |
Material: | Aluminum, Brass, Bronze, Copper, Hardened Metals, Precious Meta; | Packaging Detail: | Material:Steel and Glass Speed:up to 180-200 RPM Start temperature difference:20degree Color:Silver bottom ,gold flywheel; |
Applied software: | RO/E, Auto CAD, Solid Works,IGS,UG, CAD/CAM; | Type: | Broaching, Drilling, Etching / Chemical Machining, Laser Machining; |
Brand Name: | Stirling engine model; | Place of Origin: | Guangdong China; |
Delivery time: | 3-25days; | MOQ: | 100 pieces; |
A Stirling engine is a heat engine that operates by cyclic compression and expansion of air or other gas, the working fluid, at different temperature levels such that there is a net conversion of heat energy to mechanical work.The engine is like a steam engine in that all of the engine's heat flows in and out through the engine wall.
How it works?
This is traditionally known as an external combustion engine in contrastto an internal combustion engine where the heat input is by combustion of a fuel within the body of the working fluid. Unlike the steam engine'suse of water in both its liquid and gaseous phases as the working fluid,the Stirling engine encloses a fixed quantity of permanently gaseousfluid such as air or helium. As in all heat engines, the general cycleconsists of compressing cool gas, heating the gas, expanding the hot gas, and finally cooling the gas before repeating the cycle.
This good-looking Low Temperature Stirling Engine could be a great gift for your friends or families or yourself. It is almost ready to run: you will only have to install the flywheel. After 30 seconds of installation, put it on a cup of hot water, then it will run like Forrest Gump.
Note: the various parts of the crankshaft and connecting rod can use pencils to lubrication, never oil lubrication, once produce oil dirties, friction is very big, and not easy to clean up!!!!
Custom Sheet Metal Fabrication Dark Grey Sandblasting Anoodizing Precision Aluminum Deep Drawing Stamping Forming Part For Shell
Competitive price with good quality.
Low MOQ
Customized size and spec /OEM available.
Short lead time (7-30days according to order qty).
Packing Details : Fine Packaging Will Be Used For Your Goods:
1.Our Exporting Standard Packaging:Delivery Details : 3-30 days after received your deposit
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=100000USD, 50% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: