MachineryOffers

CF4 SL best additive product for make engine oil

Product details
Packaging Detail:If you have any requirements about the package,quantity and express delivery about sample , please contact us directly and we will customize a suitable solution for you;Form:liquid;
Selling Units:Single item;Place of Origin:Shanghai China;
API:CF-4/SL;Single gross weight:200.0 KG;
Weight:200L;Brand Name:minglan;
Type:Engine Oil Additive Package;Colour:Red-brown;
Certification:ISO;Package Preview:;
Single package size:60X60X90 cm;Expiration Date:5years;

 

T3213 CF-4/SL General Engine Oil Additive Package

Product Introduction

T3213 is a kind of functional additives package used for CF-4/SL general engine oil , and can formulate general engine oil of CF-4/SL level and the level below CF-4/SL.

 

Reference dosage

 

API Performance Level

Dosage 

CF-4/SL  Universal engine oil

7.03%(m)

 SL/CF  Universal engine oil

6.5%(m)

SJ/CF  Universal engine oil

5.8%(m)

SG/CF  Universal engine oil

5.22%(m)

 

Specification

 

Item

Typical Value

Appearance

Red brown transparent liquid

Density(20℃),kg/m3

Report

Flash Point(COC),℃

165℃

Kinematic Viscosity(100℃),mm2/s

Report

TBN,mg KOH/g

115

Calcium,%(m/m)

4.26

Zinc,%(m/m)

1.28

Phosphorus,%(m/m)

1.18

 

Packing & Storage

The product is packed in 200 liter metal drum(Net weight:190kg/drum).

During the storage, ,loading and unloading and blending, the highest temperature should not exceed 65 ℃,during long-term storage, the highest temperature should not be more than 45 ℃. For other details, please check the related MSDS.

 

FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends 
on the items and quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce according to  your samples or technical dates. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we will do 100% test before delivery.

Q8: How do you ensure our business long-term and good relationship?
A:1. We will keep good quality and competitive price to ensure our customers' benefit ;
2. We respect each customer as our friend and we sincerely do business and make friends with them no matter where they come from.

VIEW MORE