MachineryOffers

High Quality Marley water cooling tower fills & Cooling tower PVC fills & Selling hot fills for building cooling tower

Product details
Marketing Type:New Product 2020;Port:Qingdao/ Tianjin /Shanghai;
Core Components:filler;Product type:Cooling Machine Parts;
Place of Origin:Shandong China;After Warranty Service:Video technical support,Online support,Spare parts,Field maintenance and repair service;
Power:/;Local Service Location:United States,Thailand;
Type:Marley water cooling tower fills & Cooling tower PVC fills;Color:White ,black,grey and so on;
dimension(l*w*h):800*750mm,750*400mm,1600*750mm,etc;Applicable Industries:Hotels,Garment Shops,Building Material Shops,Machinery Repair Shops,Manufacturing Plant,Food & Beverage Factory,farms,restaurant,HOME USE,Retail,Food Shop,Construction works ,Energy & Mining,Food & Beverage Shops,Advertising Company;
Condition:New;Packaging:In bundle,wooden pallent or as your request;
Machinery Test Report:Provided;Payment Terms:L/C,D/A,D/P,T/T,Western Union,MoneyGram;
Voltage:/;After-sales Service Provided:Free spare parts,Video technical support,Field installation, commissioning and training,Field maintenance and repair service,Online support;
Showroom Location:United States,Thailand;Dimension(L*W*H):/;
Application:FILL IN THE COOLING TOWER AND ADD WATER RETENTION TIME;Cooling Type:counter flow;
Brand Name:GRAD;Weight:/;
Certification:CRAA ,ISO9001, ISO14001, OHSAS18001;Key Selling Points:Easy to operate;
Video outgoing-inspection:Provided;Material:PVC,PP;
Warranty of core components:1 YEAR;Warranty:1 YEAR;
Supply Ability:5000 Ton/Tons per Month;Packaging Detail:plywood packaging or naked in container;

High Quality Marley water cooling tower fills & Cooling tower PVC fills & Selling hot fills for building cooling tower

 

Product Description

 

Marley MX75 is a hanging film type that is installed in a crossflow cooling tower. It achieves cooling by spreading water into a thin film over a large vertical surface thereby exposing the water to the maximum amount of air flow.

The degree of cooling that can be achieved by a specific fill depends to a large extent on the size of the fill’s contact surface and the duration of time that the water is exposed to air. Marley MX75 fill provides much more water surface exposure per cubic foot than splash type fill.

Product Type:
 cooling tower fill
Material:
pp ,pvc
cooling tower  Type:
GRAD cooling tower 
width:
610mm, 915mm,1220mm,1520mm
Length:
1854mm, any length
thickness: 
0.28-0.5mm 
Color:
white, black,blue
Min order:
500pcs

                 

Cooling Tower Filler Features                        

1. Ideal in "dirty water" applications

2. Far more forgiving of poor water distribution caused by clogged or missing nozzles

3. Water easily redistributes itself

4. Ideal in dusty or wooded environments

5. Easy maintenance

6. Long service life

7. High-temperature designs available

8. Designs available for heavy ice loads 

 

Packaging & Shipping

Packing:  Plastic film packaging

Delivery:  Within 30 days after receiving advanced payment.

 

About us

 

Shandong GRAD Group Co.,Ltd. is established in 1993, located in Dezhou Shandong,covering an area of 700 thousand square meters, with more than 2500 employees. The total capital is 925 million RMB, and annual output value exceeds 2.5 billion RMB. During 20 years' development, GRAD Group concentrates on the central air-conditioning and compound material products and show the world a high-technological enterprise combining construction budget, technical consultation, product design, Manufacturing and debugging service. There are 10 series, over 130 Kinds of products covering the whole central air-conditioning series and the compound materials series Products. The high standard workshop covering 350 thousand square meters.

 

FAQ

1. Product warranty: Usually, our product warranty is 18 months after leaving factory or 12 months after installation.

2. Delivery time: It will depend on the product quantity. Our products are sold according to order. 

3. Installation: If the project needs our installation guidance, we can send our engineer and translator. The expenses shall be borne by the project owner. 

4, Terms of payment:L/C or T/T.

5, About the sample: if you need, we can give you delivery, you need to pay for this cost.

 

 

VIEW MORE