MachineryOffers

Nis*san GT-R R35 GTR 102mm 4" Exhaust with Mid pipe Extreme Tu*rbo Systems

Product details
Brand Name:COOLAO;Service:24 Hours;
Material:Titanium alloy;Color:As Picture;
Quality:High Quanlity;Payment Terms:T/T,Western Union,MoneyGram;
Port:Shanghai;Type:Clamp;
MOQ:1 Sets;Price:Competitive;
Product Name:Catback System;Packaging Detail:Soft Foam or Bubble wrap,box fill expanding foam;
OE NO.:universal;Item Type:Pipes;
Supply Ability:1000 Set/Sets per Month;Package Preview:;
Car Model:R35;Warranty:1 Years;
Place of Origin:Anhui China;
Product Description

 

102MM Titanium Catback  Turbo Y-Pipes Mid Pipe Resonated+Downpipe for Nissan GTR R35 2009+
 
Fitment:
 
Nissan GTR R35 2009+
 
These Catback-system  are the highest quality and best priced option available. By eliminating the restrictive catalytic converters in the factory downpipes, backpressure is reduced significantly which results in faster spool, an increase in power & a more aggressive exhaust note.
 
The 3.0" downpipes are a direct OEM replacement and will bolt up to both the stock exhaust system and aftermarket systems. These downpipes are hand crafted from mandrel bent, SS304 stainless steel and include a lifetime warranty & our "No Hassle" satisfaction guarantee which includes fitment & defects. Grade 12 installation hardware and stainless steel gaskets are included with purchase.
 
35HP+ gain by increasing overall exhaust air flow
 Manufactured from GR1 titanium alloy  polished 
Mandrel bent and fully TIG welded for strength and durability
CNC machine flanges for strong solid support and an accurate fit
Professionally made 3.0" bore.
Designed to significantly improve throttle response and increase power
Fantastic high quality stainless steel construction that we guarantee you will not be disappointed

 

Related Products

 

Company Information

 

Our Services

 

Packaging & Shipping

 

FAQ

 

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CIF.

 

Q4. How about your delivery time?
A: Generally, delivery time is 60days after payment.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?
A: 1. We keep good quality and competitive price to ensure our customers benefit;

2. We respect every customer as our friend and we sincerely do business and make friends with them,no matter where they come from.

 
   

 

VIEW MORE