certification: | ISO9001 Test Report,ect.; | Standard or Nonstandard: | Nonstandard; |
Applicable Industries: | Hotels,Garment Shops,Building Material Shops,Manufacturing Plant,Machinery Repair Shops,Food & Beverage Factory,Farms,Restaurant,Home Use,Retail,Food Shop,Construction works ,Energy & Mining,Food & Beverage Shops,Advertising Company; | Local Service Location: | None; |
Port: | Guangzhou Port; | Package Preview: | ; |
Packaging Detail: | Plastic bags,Cartons,Wooden case,Pallet,Container,ect.; | Place of Origin: | Guangdong, China (Mainland),Guangdong China; |
Free Sample: | Yes; | Condition: | New; |
After Warranty Service: | No service,Online support; | Brand Name: | Engineering plastic,GZ-Engineering Plastic; |
Showroom Location: | None; | Supply Ability: | 10000 Piece/Pieces per Month POM plastic gear rack; |
Warranty: | 3 months; | Core Components: | PLC; |
Model: | POM plastic gear rack and pinoin; | Marketing Type: | New Product 2021; |
sample: | Yes; | Video outgoing-inspection: | Provided; |
Warranty of core components: | 3 months; | Model Number: | gear rack and pinion; |
Packing: | Plastic bags,Cartons,Wodden case,Pallet,Container,ect.; | color: | Black,white.ect.; |
Payment Terms: | L/C,Western Union,D/P,D/A,T/T,MoneyGram,Pay pal. Escrow Service; | Material: | POM,POM plastic gear rack and pinion; |
Machinery Test Report: | Not Available; | Processing: | cnc maching POM plastic gear rack and pinion; |
Shape: | sheet, rod, tube, gear, pulley, guide rail, and so on,Rack Gear; |
Rack Material | UHMW-PE, Nylon, POM, HDPE or according customer's requirement | ||||||
Rack Color | Green,blue or customized | ||||||
Rack Techniques | High precision 3-axis CNC and cnc milling machine | ||||||
Rack Feature | 1. Wear resistant; 2. Impcat resistant; 3. Easily machined. | ||||||
Rack Standard Size | customized according to drawing | ||||||
Rack Application | Link chain,machine tool,etc. | ||||||
Payment | 50% T/T in advance, 50% T/T before delivery | ||||||
Place of origin | GuangZhou, China (Mainland) | ||||||
Delivery | According to the orders, usually 5-15 days |
Sales department | 1. Received the drawings |
Departement of technology | 2. Review a drawing |
PD department | 3. Caculation material |
Purchasing department | 4. Raw material inspection |
GPQ department | 5. Check out |
Plant | 6. Picking the production |
Check field | 7. The samples were checked |
Quality department | 8. The sample is qualified |
Storage department | 9. Ship sample |
Client | 10. Feedback satisfactory |
Workshop | 11. Quantity production |