| Position: | Front Bumper; | Supply Ability: | 5000 Ton/Tons per Month; |
| Port: | FOB Chinese port; | Alloy: | 6063T5/6082ect; |
| Brand Name: | Ruiyi; | Material: | Aluminum; |
| Place of Origin: | Shanghai China; | Size: | c; |
| Finished: | powder coated; | Payment Terms: | L/C,D/A,D/P,T/T; |
| Packaging Detail: | Kraft or according to guest request; |
China high quality aluminium goods extrusion bumper
We have a wide range of products including:
1. Alloy:6060/6061/6063/6082/6005/6463/7003 etc T6/T5 are available;
2. Length <=13 meters
3. Surface treatment: Mill, Anodized, Powder Coated, Wooden Transfer, etc
4. Fabricator: cutting, millling, punch, stamping, drill, CNC, assembly, package. etc.
5. One-stop Service: Mould, Extrusion, Finishing, Fabricator and Assembly, Delivery.
6. Any OEM and design are welcome.
| IV. Production capacity | ||||
| Total maxium production capacity (Tons) | 150,000 | |||
| Actual annual production (Tons in 2010) | 130,000 | |||
| How many shifts per day do you operate? | 3 shifts | |||
| How many days of production per year? | 365 days | |||
| How many years of experience do you have producing Extruded aluminum? | 31 years | |||
| Max | Average | Min | ||
| What is the Tonnage range of your Extrusion equipment? | 5500 tonnage | 1600 tonnage | 600 tonnage | |
| Max | Average | Min | ||
| What is the length range of extruded aluminum that you can produce? | 28000mm | 6000mm | 3000mm | |
| Do you have experience extruding the following Aluminum materials? (Y/N) | Material | Y/N | If No, please recommend material. | |
| 6060 T6 | Y | |||
| Do you have long-term contract with your key material suppliers? (Y/N) | Y | |||
| V. Engineering and Molding | ||||
| Do you have engineering capability in-house? (Y/N) | Yes | |||
| Can you handle engineering drawings on 3D-CAD? (Y/N) | Yes | |||
| If yes, which formats of engineering drawings can you provide? | SOLID WORK | |||
| Do you have prototyping/sample production capability in-house?(Y/N) | Yes | |||
| Can you produce extrusion molds in-house? (Y/N) | Yes | |||
| VI. Production Equipment | ||||
| If in-house | ||||
| Please respond to questions for the following equipments | In-house or Subcontracted | Description model and number of Production Equipment | ||
| Ingots heating | In-house | 28 | ||
| Extrusion | In-house | 28 | ||
| 1st cutting | In-house | 36 | ||
| T6 heat treatment | In-house | 30 | ||
| 2nd cutting | In-house | 13 | ||
| CNC bending | In-house | 2 | ||
| Punching | In-house | 12 | ||
| CNC | In-house | 10 | ||
| Anodization | In-house | 2 | ||
| Please specify other equipments: | In-house | Many | ||
| Powder coating | In-house | 4 | ||
| VII. Quality, Environmental and Product Certification | ||||
| Certificate | Date of Certificate | Certificate number | Certifying Org. | |
| What quality and environmental registrations do you have? | ISO9001 | 2009/3/6 | CN-00209Q11056R0L | CQM Certificate |
| ISO14001 | 2009/3/6 | CN-00209E2026R0L | CQM Certificate | |
| OHSAS18001 | 2009/3/6 | CN-00209S10153R0L | CQM Certificate | |
| Y | ||||
| VIII. Quality Control and Testing Equipment | ||||
| Testing Equipment | Yes/No | |||
| What quality control equipment do you have in-house? | Portbale hardness test pincer | YES | ||
| hardness test machine | YES | |||
| Material Analysis | YES | |||
| Tensile Test Equipment | YES | |||
| chemical test Lab | YES | |||
| Please specify other equipments | YES | |||



