payment terms: | L/C,Western Union,D/P,D/A,T/T,MoneyGram | Packaging Details: | carton |
Voltage: | 220V/custom | Health status: | new |
usage: | Plastic Particle Conveyor Feeder | Key words: | Vacuum Plastic Pellet Loader |
place of origin; place of origin: | Anhui, China | machine: | automatic feeder |
Showroom location: | not any | Certification: | CE ISO9001 |
Key words: | Powder plastic hopper | Dimensions (L*W*H): | 340*340*590mm |
product name: | Pellet Feeder | Absorbent material: | Plastic particles |
Core components: | PLC, motor | Applicable industries: | manufacturing plant |
Marketing Type: | New Products 2020 | port: | Shanghai |
Video external inspection: | if | type: | brush |
brand: | Kaifeng | After-sales service provided: | Free spare parts, on-site installation and commissioning training, on-site maintenance and repair services, online support, video technical support |
Core Components Warranty: | 1 year | Mechanical test report: | if |
After Warranty Service: | Video technical support, online support | Capacity (kg/hour): | 300 kg/h |
Supply capacity: | 100 sets per month | Delivery capacity: | 300-1500kg/hour |
Name: | Vacuum Hopper Loader | Local service location: | not any |
Power (kW): | 1.5 | application: | plastic material loading |
Used for: | Injection molding machine | Weight (kg): | 12 kg |
Warranty: | 1 year | | |
Product Description
Connection diagrams and technical data
Welcome to Kaifeng
FAQ
Q: How long has your factory been established?
A: Our factory has been established since 2010, but most of our engineers have worked in this industry for more than 15 years.
Q: How to control product quality?
We have always attached great importance to maintaining quality levels. In addition, we always adhere to the principle of "provide customers with better quality, better price and better service".
Q: What is your standard delivery time?
A: For 380V/50Hz/3Phase standard unit, it will take about 3~7 working days. Other voltages may take 15~20 working days. Custom units may take 20~30 working days.
Q: What is a standard loading port?
A: Standard shipping is Shanghai, China.
Q: How long is the standard warranty period?
A: From the date of the bill of lading, one year for all mechanical parts and three months for all wearing parts.
VIEW MORE