Certification: | CE; | Supply Ability: | 100000 Piece/Pieces per Month 70cc engine; |
Cold Style: | Air-Cooled; | Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram,Paypal; |
Bore And Stroke: | 47*41.4; | Displacement (ml): | 72ml; |
Stroke: | 4 Stroke; | Packaging Detail: | 1. standard package 2. as per your requirements; |
Stroke: | 4 Stroke; | Cold Style: | Air-Cooled; |
Cylinder NO.: | 1 Cylinder; | Start: | Kick; |
Ignition type: | CDI; | Model: | 70cc; |
Cylinder NO.: | 1 Cylinder; | Brand: | ANERXI; |
Port: | any port of China; | Place of Origin: | Chongqing China (Mainland); |
Package: | standard; | Brand Name: | ANERXI; |
Warranty: | 12 months; | Displacement (ml): | 72ml; |
Ignition Method: | CDI; | Start method: | Kick start; |
Lifan 70cc Motorcycle Engine Air Cooled Manual Kick Start Engine
Technical Data:
Engine Model | LF1P47FMD-B |
Engine Name | 70cc |
Engine Type | Single-cylinder,air-cooled,4-stroke |
Displacement(ml) | 72ml |
Max.Power(kw/rpm) | 3.4/7500 |
Max.Torque(N.m/rpm) | 4.8/4500 |
Compression Ratio | 8.8:1 |
Bore And Stroke (mm*mm) | 47*41.4 |
Idle Speed(r/min) | 1500+-100 |
Starting Type | Kick-starting,Manually operated clutch,Horizontal |
More Engines Please check:
https://cqaex.en.alibaba.com/productgrouplist-803203915/motorcycle_Engine.html?spm=a2700.8304367.0.0.dUohT2
Our Company:
Our company always adheres to the talent for the principle of sincerity, and all efforts to provide quality products to customers. Our products: cylinder head/cylinder body/cylinder assy/rocker arm/camshaft/crankshaft/carburetor/main&counter shaft/chain sprocket and so on.
FAQ:
Q1. Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Q2. What about the lead time?
A: Sample needs 5-7 days, large order, the lead time according to the factory actual production situation.
Q3. Do you have any MOQ limit?
A: Yes, different products have different MOQ.
Q4. How do you ship the goods and how long does it take to arrive?
A: We usually ship by DHL, UPS, FedEx or TNT. It usually takes 5-7 days to arrive. Airline and sea shipping also optional.
Q5. How to proceed an order?
1. Firstly let us know your requirements or application.
2.Secondly We quote according to your requirements or our suggestions.
3. customer confirm the PI and places deposit or whole payment for formal order.
4 We arrange the products or production.
Q6. Is it OK to print my logo on the product?
Yes. Please inform us formally before our production and confirm the design firstly, then we print the logo for you.