exhibit: | Voltage, current, power, reactive power, energy, frequency, | Resistive load, power factor: | Special alloy resistors. |
port: | Shenzhen | Supply capacity: | 50 sets per month |
Load power (constant and adjustable): | 0-40KW | Load voltage: | AC220v/380V (three-phase four-wire) 50HZ |
power supply: | 220V(±10%) 50HZ, single phase | Certification: | CE certification |
custom made: | Yes | Loading steps: | 1KW/2KW/2KW/5KW/10KW/20KW/20KW/40KW |
type: | Resistive Load Bank | model: | FST-AC220V-40KW resistive AC load box |
Origin: | Guangdong, China | Measurable voltage range: | 220VAC |
aspect: | 600*850*1000mm | Load voltage 1: | AC277V single phase, 50Hz |
Load accuracy: | ±5% | brand: | Foresight |
payment terms: | L/C, Western Union, T/T, Paypal | Warranty: | 3 years |
Power factor: | PF=1 | Accuracy class: | IP20 |
Why Load Bank Testing is Needed
Ensure your backup power systems such as UPS (Uninterruptible Power Supply), battery packs, generators, transformers, inverters, etc., especially in harsh, dusty or corrosive environments, stay in good condition when you need them most , which is very important, the main power supply switches the load during maintenance or when it stops abnormally.
technical specifications |
|
Model |
FST-AC220V-30KW-R Resistive AC load box |
load element |
Stainless Steel Resistor |
load voltage |
127V/ 220VAC , 60Hz , three phase |
loading steps |
5*1KW/3*5KW/1*10KW (1-30KW adjustable) |
power factor |
PF=1 |
Load accuracy |
±5% |
digital instrument |
Voltage, current, power, frequency, etc. |
power supply |
220V 50Hz, single phase |
control method |
Manual control via buttons |
wire connection |
Copper bus bars for wire connections |
insulation level |
f |
degree of protection |
IP20 (indoor use) |
fan noise |
75 decibels |
cooling method |
Forced air cooling |
Operating mode |
continuously working |
Safeguard |
Overheat/buzzer alarm, overheat/overvoltage protection, emergency stop button |
ambient temperature |
-10℃~+50℃ |
aspect |
600*850*1000mm |
weight |
About 80KG |
flexibility |
Four wheels, rings on top of chassis |
humidity |
≤95% |
high |
≤2500 meters |
Each load group includes standard items:
Load box host -- 1 set
Host power cord -- 1 piece (inside the load box)
Product main and auxiliary diagrams (wiring diagrams of product components) -- 1 sheet (electronic version)
User Manual--1 piece (electronic version)
Load Group Operation Guide
Ensure that all load bank switches and EUT (Equipment Under Test)strength
leavebefore connecting.
Plug the power cord into the load bank power outlet
Load cable connection between load bank connection terminals and EUT
Correspondingly, connect the terminals in the order of phase A/B/C/N/PE. Make sure to go from one cable to the other.
Double check to make sure all load cables are securely connected.
Load Bank mains power on, press the green "strength"—fans work.
EUT powered on
Press the red load step control switch "LCD Monitor"—Prepare to load test.
Turn on/off miniature circuit breakers to regulate load power.
view data