Use with: | green plants etc. | MOQ: | 1 set |
Supply capacity: | 1000 bags per day | Health status: | new |
product name: | Hydroponic Planting System | Applicable industries: | farm, retail |
Packaging Details: | Poly bag or carton package or electronic package. 2. We insist on using only original packaging materials to make the packaging look brand new and improve product quality. 3. Fine and complex packaging can be made according to customer requirements | hole: | 108 |
weight: | 15 kg, 15 kg | Local service locations: | not any |
Video outbound inspection: | if | Core component warranty: | 6 months |
Marketing Type: | Hot Products of 2019 | Material: | Food grade PVC pipe |
Showroom location: | not any | Main selling points: | high rigidity |
usage: | Water saving irrigation system | size: | Three floors |
Mechanical test report: | not available | payment terms: | Western Union, T/T |
model: | SK-indoor | Core components: | Pump |
port: | Shenzhen | Warranty: | unavailable |
Preparations before hydroponics
First, prepare seeds, nutrient solution and a bucket of about 15L. For seeds, you can choose leafy vegetables such as cabbage, lettuce, coriander, and celery.
Hydroponics steps:
design principle
The piping system uses a unique inner plug design. The inner plug is made of food grade PE material. The design makes the entire piping system an S-flow. The water droplets increase the dissolved oxygen in the water.
Precautions
No glue is required for hydroponic equipment installation, but it must be installed according to the installation instructions.
You need to prepare a water tank of about 10 liters, it is recommended that you choose an opaque water tank with a cover. You will also need to provide power.
Place the hydroponic equipment in a sunny place with at least 4 hours of light every day to avoid malnutrition caused by insufficient light.
Packaging accessories:
Hydroponic Stands and Grow Tubes
110/220V water pump*1
Planting basket*108
Planting sponge*108
Installation Instructions*1
Hose*1
cutting edge
The pump may slow down after 3-4 months of operation. In this case, the pump needs to be disassembled to clean the rotor.
Approved certification
All products of our NFT CHANNEL have passed ISO9001:2008 certification; CE and SGS.
1. Your inquiry about our products or prices will be replied within 24 hours.
2. Well-trained and experienced staff answer all your inquiries in fluent English.
3.OEM&ODM, any circuit breaker you customized we can help you design.
4. Provide dealership for your unique design and some of our current models.
5. Protect your sales area, design concept and all your private information.
Factory Tour