MachineryOffers

Solid Brass Matte Black One Hole Wall Mount Square Shower Door Glass Clamp

Product details
Packaging Detail:One piece in one white box. And several white box in one carton.;Model Number:1401-BL;
Brand Name:Allwin;Usage:Glass Clamp;
Size:51*51mm;Selling Units:Single item;
Place of Origin:Taiwan, China;Structure:Glass Clamp;
Single package size:10X10X10 cm;Package Preview:;
Material:Solid Brass,Solid Brass;Measurement system:INCH,Metric;
Standard or Nonstandard:Standard;Single gross weight:5.0 KG;

Solid Brass Black One Hole Wall Mount Square Shower Door Glass Clamp

 

Product Description

Solid Brass Black One Hole Wall Mount Square Shower Door Glass Clamp

Solid Brass Matte Black One Hole Wall Mount Square Shower Door Glass Clamp

 

Item nr.

1401-BL

 Size

51 x 51 x 4.5 mm

 Material

solid brass

 Finish

Brushed Nickel/
Polished Chrome/ electroplating 

Product Photos

 

 

Packaging & Shipping

 

Company Information

 

Procedure Video

 

 

Contact Information

ALLWIN Contact Information

Contact Person

Robert Wang

E-mail

Allwin(at)hibox.hinet.net

Telephone

+886 4 2293 0000

Fax

+886 4 2293 0707

Website

www.allwinhardware.com

 

 

How We Commitment To Quality

ALLWIN commitment to quality” is one of the values in ALLWIN culture.

To ensure the quality consistent, ALLWINinspect and well-control each procedure throughout the mass-production.

1. To ensure the material component follows the ASTM standard, ALLWIN use spectrometer to check the raw material before production. Before casting, we check the stainless steel element. After die-cast out, we check aging the casting. We also use spectrometer to check the solid bar before we start to machining it.

We also do the hardness testing for the product if necessary.

2. ALLWINuse measuring tools to check the product in each procedure throughout the mass-production to ensure the dimension of product meet customer’s requirement.

3. ALLWIN arrange Quality control department in each step of the mass-production to ensure each production fulfill their duty to produce well-product.

4. ALLWIN use salt spray testing machine to test the product, to ensure it meet specific corrosion-resistance requirement.

5. ALLWIN use 2D and 3D drawing to communicate with customer, which is clearly and accurately.

Base on above five quality control steps, ALLWIN proudly says that “ALLWIN commitment to quality”

VIEW MORE