Port: | shanghai, qingdao,lianyungang; | Warranty: | 1 year; |
Supply Ability: | 7000 Piece/Pieces per Month; | Rod diameter: | 1' - 60'/25 -1000 mm; |
Standard or Nonstandard: | nonstandard; | Bore diameter: | 2'-50'/50-1500mm; |
Place of Origin: | Jiangsu China; | Structure: | Piston Cylinder; |
Payment Terms: | L/C,Western Union,T/T; | Max pressure: | 9600 psi/600 bar; |
Application: | Engineering, coal&mine, agriculture, environmental sanitation; | Max Stroke: | 366'/9280 mm; |
Material: | 20#,40#,45#,16Mn,27SiMn etc.; | Packaging Detail: | wooden case, pallet, paper carton, or as per the requirement of the clients.; |
Customized support: | OEM,ODM; | seal kits: | Hallite, Parker, NOK, SKF, DICHTOMATIK, Trelleborg, Merkel; |
Certification: | CE,CCS; | Package Preview: | ; |
Certificates: | ISO9001,CE, TUV, CCS; |
HYDRAULIC CYLINDER
Widely used in equipment for Engineering, Coal&mine, Agriculture and Environmental sanitation
Features |
customer hydraulic cylinder |
Bore Diameter |
2'-50'/50-1500mm |
Rod Diameter |
1' - 60'/25 -1000 mm |
Wall Thickness |
0.1'-4'/3-100 mm |
Max Stroke |
366'/9280 mm |
Max Pressure |
9600 psi/600 bar |
Test Pressure |
14500 psi/1000 bar |
Material |
20#,40#,45#,16Mn,27SiMn etc. |
Seal Kits |
Hallite, Parker, NOK, SKF, DICHTOMATIK, Trelleborg, Merkel |
Dimensional Accuracy |
H7-H11 |
Bore Roughness |
Ra 0.4-1.6mm |
Coating |
hard chrome |
Purpose |
engineering, Coal &mining, agricultural machinery, environmental sanitation |
OEM/ODM |
Yes |
MOQ |
10 Pieces |
Certificates |
ISO9001,CE, TUV, CCS |
Q1. Are you a manufacturer?
Yes, we have manufactured hydraulic cylinders for over 30 years. They are widely used in Engineers, Coal&mine, Agriculture and Environmental Sanitation etc.
Q2. Do your products come with a warranty?
Yes, we have one year warranty.
Q3. Can we customize our products from you?
Yes, actually 70% of our products are customized for our clients. You just need to let us know your demand (specifications &drawing is better), and we shall realize them for you.
Q4. How do you deliver the products?
By sea, by plane, or by couriers.
Q5. How many days the samples can be finished, And how about the mass production?
Generally 5-7days for samples making. The lead time of mass production will depend on quality, production art and so on. Generally 35days.