actual splitting force: | 600-680; | Certification: | ISO9001; |
Warranty: | 1 Year; | the hole depth: | 300m-800mm; |
Material: | Iron; | Single gross weight: | 45 KG; |
Efficiency: | Highly; | Package Type: | wooden case; |
After-sales Service Provided: | No overseas service provided; | Single package size: | 80X20X20 cm; |
wedge length: | 150-380mm; | Dimension(L*W*H): | 450*410*700; |
Place of Origin: | Shandong China (Mainland); | Brand Name: | HW; |
Motor Type: | AC Motor; | Condition: | New; |
crack time: | 5-12s; | Applicable Industries: | Construction works ; |
Selling Units: | Single item; | After-sales Service Provided: | Free spare parts,Online support,Video technical support; |
Diameter: | 36-50mm; | Model: | Rock splitters; |
Application: | rock; | Type: | Rock Splitter; |
The stone is often broken into a lot of pieces, so that the utilization rate of stone is less than 30%.That is, the mining of stone is labor, time, but also caused a great waste of resources.If the use of splitting machine mining, as long as the stone to be mined on the surface of a few holes and some grooves, and then use the splitting machine split under the stone.If the same mining 10 meters long, 6 meters wide, 6 meters high stone, only 10 holes, a total length of 60 meters.
It consists of two parts: hydraulic pump station and splitter. The cylinder is driven by the ultra-high pressure oil output from the pump station. After mechanical amplification, the split object can be split in the predetermined direction.Product features:
Splitting process without vibration, no impact, no noise, no dust, a few seconds to complete the splitting, single big splitting force up to 5,000 tons, can control the splitting, dismantling, splitting size, light weight, simple operation, easy maintenance can be used in indoor and narrow site demolition work can be used for underwater construction.
-1* Air drill or rock drill drilling, hole depth is greater than two times the gun
-2* Insert each splitter in turn into the hole
-3* After starting the hydraulic pump station to observe the pressure index, shut down the pressure handle of the splitter in time
-4* The splitting machine will finish the work in 3-5 seconds. After the stone is split, push the pressure handle to the falling position to recover the middle wedge, put forward the splitting machine and carry out the next hole operation
Delivery within 3 days after receive your payment
The stock is enough.
The goods value more than USD 1000 can transport by sea.
Lower than USD 1000 transport by express.
Using with Air Compressor. Click picture to learn more ↑
Gasoline power Rotary Drill. Click picture to learn more ↑
Large QTY. please contact us for discount!
Alan Lu
WhatsApp/Wechat: +86 15998722880
↓↓↓↓↓↓↓↓↓↓