Brand Name: | ball joint rod end; | Material: | metal/stainless steel/steel/Aluminum/brass/plastic; |
name: | ball joint rod end; | Bore Size: | 4 - 280 mm; |
Port: | ShenZhen port; | test equipment: | projector; |
Type: | Rod End; | Precision Rating: | +-0.000mm; |
tolerance: | +/- 0.05mm; | Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram; |
Supply Ability: | 100000 Piece/Pieces per Month; | Packaging Detail: | Packaging Detail:bubble pack individually to prevent from damaging and scratches in transporting, then in carton; |
Delivery Detail: | within 7 working days; | Place of Origin: | Guangdong China; |
Model Number: | ball joint rod end; |
stainless steel ball joint rod end bearing ,Joint Rod,ball joint rod end
Specialty Hardware Manufactory!
Surface: as your requirement
Material: steel /stainless steel/ aluminum / brass / iron / zinc / alloy
Any other material and dimension depends on customers' demand.
Usage: machinery / furniture / toy / woodboard / wall
Manufacturing process: casting parts
Euipment: casting machine
Testing equipment: projector
Tolerance:+/-0.05MM
We are willing to provide with sample for quality and function testing.
We are ISO 9001: 2008 certified firm.
Industry Focus | Appliance/ Automotive/ Agricultural Electronics/ Industrial/ Marine Mining/ Hydraulics/ Valves Oil and Gas/ Electrical/ Construction |
Intended Application | Shafts Valve Components Automatic Door Components Cable/ Electronic Connector Fire Suppression System Components Fittings/ Fasteners Gears/ Hardware Roller Bearings |
Lead Times Available
| Max: 2 Weeks (On Initial Order) Rush Services Available |
Industry Standards | ISO 9001:2008 PPAP RoHS Compliant |
Additional Capabilities | CAD Design Services CAM Programming Services Coordinate Measuring Machines (CMM) Reverse Engineering |
Equipment List | From simple 2-axis turning to 7-axis, turn-mill-drill CNC Swiss-type machines, we are equipped with a full line of CNC equipment from the following manufactures: molding machines/ stamping machines automatic lathe machines/ spring machines. |
Automation Capabilities | Continuous Machining |
Material (Metals) | Alloy Steels/ Aluminum/ Brass/ Bronze Alloys Carbon Steel/ Copper/ Stainless Steel/ Tool Steel Cold Rolled Steel/ Bearing Steel |
Material (Plastic Polymers) | ABS/ Delrin/ Nylon/ PVC |
Processes (Special Capabilities) | Broaching/ Hobbing/ Slotting |
Tolerance | ±0.0002 in ±0.0051 mm |
Company view
Company Certifications
Packaging
Shipping
Q1:How to guarantee the Quality of Industrial Parts?
A1:we are ISO 9001-2008 certified firm. we have the integrated system for industrial parts quality control. We have IQC (incoming quality control), IPQCS (in process quality control section), FQC (final quality control) and OQC (out-going quality control) to control each process of industrial parts prodution.
Q2:What's the Advantage of Your Parts for Industry Products?
A2:Our advantage is the competitive prices, fast delivery and high quality. Our employees are responsible-oriented, friendly-oriented,and dilient-oriented. our Industrial parts products are featured by strict tolerance, smooth finish and long-life performance.
Q3:what are our machining equipmengts?
A3:Our machining equipments include CNC milling machines, CNC turning machines, stamping
machines,hobbing machines, automatic lathe machines, tapping machines, grinding machines,
screw machines, cutting machines and so on.
Q4: What shipping ways our use?
A4:Generally speaking, we will use UPS or DHL to ship the products. Our customers can reach the
products within 3 days.
If our customers do not need them urgently, we will also use Fedex and TNT.
If the products are of heavy weight and large volumn, we will ship them by sea. This way can save
our customers a lot of money.
Q5:Who are our main customers?
A5:HP, Samsung, Jabil Group,Lexmark,Flextronic Group.
Q6:What materials can you handle?
A6:Brass,bronze,copper,stainless steel, steel,aluminum,titanium And plastic.
Q7:How Long is the Delivery for Your Industrial Part?
A7:Generally speaking, it will take us 15 working days for machining parts and 25 working days for
the for stamping parts products. But we will shorten our lead time according to customers' demands
if we are able to.