Brand Name: | TOPCN; | After Warranty Service: | Video technical support,Online support,Spare parts,Field maintenance and repair service; |
After-sales Service Provided: | Free spare parts,Field installation, commissioning and training,Field maintenance and repair service,Video technical support,Online support,No after-sales service; | Material: | Stainless Steel; |
Packaging Detail: | small soap plodder packaging: wooden with strong seaworthy packing suitable for export; | Applicable Industries: | Manufacturing Plant,Machinery Repair Shops,Food & Beverage Factory,Food Shop,Food & Beverage Shops; |
Port: | Guangzhou HuangPu; | Warranty: | 1 Year; |
Capacity: | 150-300kg; | Showroom Location: | None; |
Soap fined machine capacity: | 150kg/h; | Product Type: | Soap; |
Package Preview: | ; | Power: | 4kw; |
Place of Origin: | Guangdong China; | Payment Terms: | L/C,T/T,Western Union; |
Local Service Location: | None; | Key Selling Points: | High Safety Level; |
Supply Ability: | 50 Set/Sets per Month soap extruder; | Name: | Soap plodder; |
Related Products
Soap stamping machine Soap packaging machine Soap stamping machine
TOPCN Soap Plodder:
The capacity is 150kg/h. It can produce the toilet soap and laundry soap. The main equipment are including mixer, mill, plodder and stamping machine. The advantage for this production line is small investment, simple equipment and convenient operation.
1.soap plodder;
2.soap extruder.
Soap extruder (TPVP-150) |
Capacity:150kg/h |
Diameter of roller:Φ140mm |
Revolution:10-23r/min (speed adjustable) |
Power:4kw |
Material:fame-Q235 carbon steel 60 splicer made; the part reached by soap noodle- stainless steel. |
1.DELIVERY LEAD TIME:
15-25 WORKING DAYS FOR THE MACHINE AFTER RECEIVED DEPOSIT
2.TERMS OF PAYMENT
BY 40% IN ANVANCED, THE BALANCE 60% BY T/T BEFORE SHIPMENT
3.PRICE VALID UNTIL
30 DAYS.
4.PACKING:WOODEN WITH STRONG SEAWORTHY PACKING SUITABLE FOR EXPORT
5.PORT OF SHIPMENT
GUANGZHOU PORT
1.WARRANTY
THE SELLER WARRANTY THE MACHINE FOR ONE YEAR, AND SUPPLY ONE YEAR FREE SPARE PARTS WITH THE MACHINE.
2.TERMS FOR INSTALLATIONS,STARTING-UP AND ADJUSTMENT.
THE SELLER SHOULD SEND ENGINEERS TO CARRY OUT INSTALLATION AND DEBUGGING OF THE EQUIPMENT IN BUYER’S PLACE IF REQUESTED. THE COST FOR INTERNATIONAL DOUBLE WAYS AIR TICKETS SHALL BE PAID BY BUYER FOR THE ENGINEER. BUYER SHALL
COOPERATE WITH SUPPLIER’S ENGINEER AND MAKE ALL THE INSTALLATION CONDITION READY TO WORK. SUCH AS”WATER, ELECTRICITY,RAW MATERIAL ETC.
3.OPERATION MANUAL
THE OPERATION MANUL WILL BE SHIPPED WITH THE GOODS AND IN ENGLISH VERSION.