Product Type: | Soap; | Mixer capacity: | 50-200kg/batch; |
Place of Origin: | Guangdong China (Mainland); | Name: | Small soap production line; |
Port: | Guangzhou HuangPu; | Packaging Detail: | Small soap production line packaging: wooden with strong seaworthy packing suitable for export; |
Soap fined machine capacity: | 150kg/h; | Brand Name: | TOPCN; |
Supply Ability: | 50 Set/Sets per Month bar soap production line; | Printing speed: | 15-30pcs/min; |
Payment Terms: | L/C,T/T,Western Union; | Three roller mill power: | 4kw; |
After-sales Service Provided: | No after-sales service,Free spare parts,Field installation, commissioning and training,Field maintenance and repair service,Video technical support,Online support; | Warranty: | 1 Year; |
Material: | Carbon Steel; | After-sales Service Provided: | Engineers available to service machinery overseas; |
Related Products
Soap stamping machine Soap Cutting machine Soap Extruder
The capacity is 150kg/h. It can produce the toilet soap and laundry soap. The main equipment are including mixer, mill, plodder and stamping machine. The advantage for this production line is small investment, simple equipment and convenient operation.
1.toilet soap production line
2.small soap production line
3.bar soap production line
toilet soap production line | small soap production line | 2.8 | bar soap production line |
1.DELIVERY LEAD TIME:
35-50 WORKING DAYS FOR THE SEMI AUTOMATIC MACHINE AFTER RECEIVED DEPOSIT
2.TERMS OF PAYMENT
BY 40% IN ANVANCED, THE BALANCE 60% BY T/T BEFORE SHIPMENT
3.PRICE VALID UNTIL
30 DAYS.
4.PACKING:WOODEN WITH STRONG SEAWORTHY PACKING SUITABLE FOR EXPORT
5.PORT OF SHIPMENT
GUANGZHOU PORT
1.WARRANTY
THE SELLER WARRANTY THE MACHINE FOR ONE YEAR, AND SUPPLY ONE YEAR FREE SPARE PARTS WITH THE MACHINE.
2.TERMS FOR INSTALLATIONS,STARTING-UP AND ADJUSTMENT.
THE SELLER SHOULD SEND ENGINEERS TO CARRY OUT INSTALLATION AND DEBUGGING OF THE EQUIPMENT IN BUYER’S PLACE IF REQUESTED. THE COST FOR INTERNATIONAL DOUBLE WAYS AIR TICKETS SHALL BE PAID BY BUYER FOR THE ENGINEER. BUYER SHALL
COOPERATE WITH SUPPLIER’S ENGINEER AND MAKE ALL THE INSTALLATION CONDITION READY TO WORK. SUCH AS”WATER, ELECTRICITY,RAW MATERIAL ETC.
3.OPERATION MANUAL
THE OPERATION MANUL WILL BE SHIPPED WITH THE GOODS AND IN ENGLISH VERSION.