MachineryOffers

Tonsen Brand One head two head keg washer semi-auto beer keg cleaner washer on sale

Product details
Head:single head, double heads;Supply Ability:100 Sets per Month;
Port:Qingdao Port;Name:Keg Washer;
Certification:CE, ISO;Place of Origin:China;
cleaning tank:2 or 3 cleaning tanks;Applicable Industries:Food & Beverage Factory;
Warranty:1 Year;Control system:Automatic;
After-sales Service Provided:Field installation, commissioning and training;Heating method:Electricity or Steam;
Power:3/18kw;Capacity:30-100kegs/hour;
Packaging Detail:1) Will be packed with soft protection material and mounted on steel frame 2) All accessories and spare parts will be packed with soft protection material and then put into iron box 3) After loaded into containers, all equipment will be fixed to the containers.;Function:stainless steel kegs;
Dimension(L*W*H):depend;Keg Capacity:20L, 30L, 50L, 60L;
Voltage:380V, 240V, 400V;Condition:New,New Design;
Brand Name:Tonsen;Material:SUS304;
Processing:Washer;Payment Terms:L/C,T/T;
Processing Types:beer keg;Weight:150kg, 300-500KG;

 

     

                    

       

Main technical parameters

Dimension

1000mm*1600mm*2000mm

Net Weight

350KG

Power

Steam Heating:3KW;Electric Heating:18KW

Production Capacity

60-100kegs/H

Cleaning mode

Invert Washing

Applicable Kegs

Kegs with Diameter 250-500mm,Height 360-600mm

Heating Way

Electric Heating or Steam Heating

Power Supply Voltage

AC 380V 50HZ(or customized)

Working Process:

Start(pressing)→Water washing→Lye(disinfectant)washing→Hot water washing→Hot water washing→Steam sterilization→CO2 pressurization→Stop

 

                      

Glimpse of factory

Product details

Semi-Automatic Keg Washer/Keg Cleaning Machine/Keg Cleaner

Our keg washer mainly for:

-Micro beer brewery plant/factory

-Pub/restaurant/hotel beer brewery 

 

Working Procedures

Load the keg → start (cylinder pressing tightly) → air blowing (draining residue) → scoured by clean water → air blowing (draining water) → extracting tube scoured by lye → air blowing → scoured by lye → air blowing (circulation of lye) → scoured by clean water → air blowing (draining water) → steam blowing → CO2 blowing → scoured by sterile water → CO2blowing → prepare CO2 pressure → reset the cylinder → unload the keg

 

 

 

 

 

package and delivery

For delivery, we can promise to ship the goods in time.I stress this point because at present, the Chinese government has a very strict requirement for the factory, if the factory doesnt have a complete certificates for the production, they will face the problem to be closed. And this will affect the delivery time. And for Tonsen, we have get all the certificates so we never meet this problem.

CE certificate and SGS certificate

For our products, we have CE certificate and SGS certificate, also, we have many sample projects in many countries, can give you the contact ways if you want to check with them for the quality of our products.

  

VIEW MORE