Annual operating hours: | 8000 hours | port: | Shanghai |
energy consumption: | 0.30~0.35KWh/m3 | Warranty: | 1 year |
Certification: | ISO9000:2000 | Supply capacity: | 30 sets per year |
capacity: | 50,000Nm3/day~ 2,000,000Nm3/day | Voltage: | 6~10KV, 380V |
Cooling type: | MRC, nitrogen expansion cycle | Health status: | new |
place of origin; place of origin: | China Shanghai | payment terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Packaging Details: | Wooden case, oversized equipment: bulk cargo | product: | liquified natural gas |
Operational flexibility: | 50~105% | weight: | ***Kilogram |
After-sales service provided: | Video technical support, free spare parts, online support, on-site installation, commissioning and training, on-site maintenance and repair services, engineers can service machinery overseas | brand: | Biz |
LNG plant
Product Description
The general production process uses natural gas as the raw material (containing about 90% methane), after dehydration, removal of acid gases (H2S, CO2, etc.) and heavy hydrocarbons, it enters the refrigeration unit and cools to about -162 °C and becomes liquid. Its volume is reduced to 1/625 of the gas phase. Liquefied Natural Gas (LNG) is stored in cryogenic LNG storage tanks. And supply to users through the transportation system.
Technical Features
Split skid-mounted design, easy installation and short construction period.
Standardized and modular plant design, compact plant structure, small footprint, saving investment, flexible layout according to terrain, good stability and regional adaptability.
Absorption and removal of acid gases (CO2).
Using molecular sieve and PSA dehydration process.
Mercury is removed by activated carbon soaked in sulfur.
LNG is liquefied using a single-stage MRC refrigeration process.
The device adopts DCS control system.
Major equipment
LNG plant consists of 4~6 units
Original natural gas metering and compression device
Raw natural gas decarburization and dehydration device
Original natural gas mercury removal device
Refrigeration compressor unit
Natural gas cryogenic liquefaction plant
LNG storage tank system
loading and unloading unit
Flow chart
We can provide turnkey or EPC services. We can provide design, equipment manufacturing, equipment installation, technical support and after-sales service.
The equipment is packed in wooden boxes.
Bulk transportation of large equipment.