MachineryOffers

High pressure grouting machine

Product details
Delivery Details:Ship within 7 days after paymentPackage:1000
MOQ:1 setPackaging Details:1 set/carton. High pressure resin grouting machine.
Operation:electric drill operationusage:water proof
Supply capacity:1000 high pressure grouting machines per weekMaterial:aluminum
type:waterproof toolsInjection Packer:Ruth Injection Packer
Function:Injection resin inletpayment terms:L/C, T/T, Western Union
application:waterproof usepenetration:put or enter
size:13*100mmport:Shanghai
Product Description

 

  1. Item: Portable PU Resin Injection Machine
  2. Brand Name: Ruth Brand
  3. MOQ: 1 set
  4. Sample time: 3 days - polyurethane grouting machine
  5. Package details:

    1 set/box, box size: 46*22*49cm, net weight: 9kgs
    20 sets/tray, tray size: 1*1*1M

  6. Easy to carry and maintain, the maximum output pressure can reach 70MPa.
  7. Injection pressure: 0-70Mpa (8000-10000Lb)
  8. Two feeding methods: pouring, suction
  9. The drill is Matabo. Power Consumption: 560W/220V or 110V

 application materials

 

WPU and OPU foam leak stopper, concrete crack waterproofing, epoxy resin.

Application field

Subway stations, tunnels, culverts, foundation improvement, soil settlement, reservoirs, port works, roofs, cracks, construction joints, shrinkage cracks, basement hairline cracks and other waterproofing projects.

 

Specification 

High pressure injection machine, injection machine, pressure regulating injection machine.

Weight (including packaging)

about 10 kg

output pressure

70 MPa

restart pressure

less than 20 MPa

Safe Range of High Pressure Hose

less than 70 MPa

Switch valve safety range

less than 50 MPa

 


  

application materials

 

Hydrophilic polyurethane (WPU) and hydrophobic polyurethane (OPU) foam stopper, epoxy resin.

 

Application field

 

Subway stations, tunnels, culverts, foundation improvement, soil subsidence, reservoirs, port engineering, roofs, cracks, construction joints, shrinkage cracks, basement hairline cracks, etc., water stop works.

 

Points to note when applying

  1. After 5 minutes of construction, if the injection material is not ejected from the crack, stop the injection. Check for cross-drilled buried pipes or other unnoticed holes.
  2.  All application processes should be closely watched. If the injection machine pressure remains high after releasing the valve on the connector, check for cracks and injection packers.
Packaging and Shipping

 

Air Freight: Arrive within 2-7 days after payment received, except weekends and holidays.

Shipping: Delivery within 2-5 days after payment received, except weekends and holidays.

 

 

VIEW MORE