Condition: | New; | Name: | Energy-saving Mortar Line; |
Package Preview: | ; | Advantage: | Easy to operate and easy to use; |
Worker required: | 2-3 workers; | Supply Ability: | 7 Set/Sets per Week Wall putty mortar mixing plant production line price; |
Production Capacity: | 20-30T; | Applicable Industries: | Manufacturing Plant; |
Model Number: | YSL1000; | Voltage: | According to customer demand; |
Mixing time: | 25mins per batch; | Packaging Detail: | 1. Use the crane to load the equipment into the container 2. Equipment packaging plastic film, waterproof 3. Wood packaging for vulnerable equipment, which is prohibited from impact 4. Instructions for installing the instruction cabinet; |
Application: | Dry Mortar Production Line; | Port: | Shanghai, Qingdao; |
Power: | 25kw; | Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram; |
Packing: | TD-F-01 Automatic Valve Packing Machine; | Certification: | ISO; |
Dimension(L*W*H): | Working Site; | Key Selling Points: | Easy to Operate; |
After-sales Service Provided: | Online support,Free spare parts,Field installation, commissioning and training,Field maintenance and repair service,Video technical support; | Place of Origin: | Henan China; |
Color: | According to customer demand; | Features: | Simple; |
Weight: | based on configuration; | Key equipment: | Electric Control Cabinet; |
Total power: | 25KW; | Warranty: | 1 Year; |
Brand Name: | YiShang; |
Dry mixing mortar production line installation site
Installation schematic of dry mixing mortar production line
Equipment detail display
Related parameters of dry mixing mortar production line
Model | Capacity | Mixing time | Total power | Worker required |
YS-500 | 1-2T/H | 15-20min/batch | 17.5kw | 2-3workers |
YS-1000 | 2-4T/H | 15-20min/batch | 19.5kw | 2-3workers |
YS-2000 | 5-6T/H | 15-20min/batch | 24kw | 2-3workers |
YS-3000 | 6-8T/H | 15-20min/batch | 28kw | 2-3workers |
1 | Masonry mortar | 4 | Ceramic tile adhesive mortar |
2 | Floor mortar | 5 | Concrete masonry mortar |
3 | Tile group |
|
1. Use the crane to load the equipment into the container
2. Equipment packaging plastic film, waterproof
3. Wood packaging for vulnerable equipment, which is prohibited from impact
4. Instructions for installing the instruction cabinet