Packaging Details: | Automatic machine for the production of nails with high speed iron wires 1.wooden frame 2.Double reinforcement 3.30 sets / 20 "container; | Applicable industries: | Automatic machine for making high speed iron wire nails; |
But you: | Qingdao Shanghai Ningbo; | Models: | HS-D713; |
Machinery test report: | With one condition; | Location of the exhibition hall: | Asnje; |
Type of marketing: | New product 2020; | Product name: | Automatic machine for making high speed iron wire nails; |
Supply Ability: | 50 sets per week; | Keywords: | Nail making machine for Bangladesh; |
Production capacity: | 320 pieces / hour; | Capacity: | 320 pieces / hour; |
Warranty service: | Video technical support, online support, spare parts, on-site maintenance and repair service; | Condition: | New; |
Weight (KG): | 1100 kg; | Brand Name: | HS; |
Country of origin: | Henan, China; | Nail length: | 25-80 mm; |
Location of local service: | Asnje; | Power: | 3.4 kw; |
Machine weight: | 1100 kg; | Payment terms: | L / C, Western Union, D / P, D / A, T / T, MoneyGram; |
Application: | Machine for the production of nails z94-4c; | Preview of the package: | ; |
Machine size: | 1900 * 1200 * 1250mm; | Main ingredients: | PLC, Engine, Bearings, Gearbox, Engine, Pressure vessel, Gear, Pump; |
Guarantee: | 1 year; | Highlights: | Competitive price; |
Video inspection at the exit: | With one condition; | Basic components warranty: | 2 years; |
Nail diameter: | 2.8-3.5mm; | Power (kW): | 3.4; |
The automatic high-speed iron wire production machine is mainly used for the production of various specifications of steel nails. If slightly modified, other special steel nails can be produced, such as oil blanket nails, V nails, U nails, corrugated nails, firing nails, gun nails, and so on. Steel nails can be widely used in industry, construction and repair. The main design of the machine refers to the design of similar high precision products in West Germany, and adopts domestic and foreign customers. According to the principle of favorable use and operation, a new generation of automatic nail production machinery has been developed independently. The device has beautiful appearance, smooth lines, scientific and reasonable structure, and the central slide cleaning adjustment adopts the iron type adjustment, which makes operation and maintenance more convenient. Lubrication adopts automatic oil supply system, making work more stable and reliable, and noise is greatly reduced (about 10 points). Beibei) greatly improved working conditions and reduced the limitations of the specifications of various models, which can effectively reduce the investment cost of investors. Once the nailing process is fully automated, high quality steel nails can be continuously produced once started.
parameter | unit | Z94-5,5C | Z94-4C | Z94-3C | Z94-2C | Z94-1C |
Nail diameter max | mm | 5.5 | 4.5 | 3.4 | 2.8 | 1.6 |
Dia of the nail min | mm | 3.7 | 2.8 | 1.8 | 1.2 | 0.9 |
Maximum nail length | mm | 150 | 100 | 80 | 50 | 25 |
Length of thoit min | mm | 80 | 50 | 30 | 16 | 9 |
Set by designed | piece / min | 200 | 260 | 320 | 350 | 450 |
Engine power | kw | 5.5 | 4 | 3 | 2.2 | 1.5 |
Weight (approx) | kg | 2500 | 2000 | 1400 | 1200 | 560 |
Overall dimensions | mm | 2800x1800x1800 | 2200x1600x1650 | 2000x1400x1400 | 1700x1300x1400 | 1500x1300x1200 |
Packages and deliveries
Transportation: by boat or by air
1.Help choose the most suitable car.
2.adjust the car according to your request.
3. I give you the details and video of the car to help you use the car better.
4. Normally the service life of our cars can be 3-5 years.
5.We offer complete set of spare parts and tools that break down easily.
6. We can send our engineer abroad to train customers to operate the machine.
7.Normally we can solve any problem online together with our customers.
1.Q: Are you a factory or trading company?
A: we are a factory
2.Question: Where is your factory located? How can I visit there?
A: Our factory is located in Zhengzhou city, Henan province, China, about 2 hours by flight from
Guangzhou.We open our arms and warmly welcome you to visit us !!
3.Question: What is the material of your products?
Answer: The materials are according to the raw material of international standard quality to be made
it, too, can be as the requirements of our customers.
4.Q: How does your factory work in terms of quality control?
Answer: We have the person to control the car from start to finish. Our factory has won
Authentication BV, Intertek, SGS.
5.Q: What are your payment terms?
Answer: 30% T / T in advance, 70% when you receive B / L. or L / C UNPROVOCABLE copy.
6.Q: How much is your driving time?
A: 3-10 days after receiving the deposit or original L / C.