MachineryOffers

China coal Excellent and good price High Quality Coal Mining Pneumatic Jumbolter Rock Bolting Anchor Drilling Rig Machine

Product details
model number:MQT;Weight:55kg;
gas consumption:4.5m;Voltage:380V;
Brand Name:hengshuo;Payment Terms:L/C,D/A,D/P,T/T,Western Union,MoneyGram;
Packaging Detail:wooden case;rotation speed:≥560r/min;
Port:shanghai;Certificate:IOS9000;
Place of Origin:Jiangsu China;After-sales Service Provided:No overseas service provided;
power(w):2.8kw;Condition:New;
Type:Core Drilling Rig;Supply Ability:1000 Set/Sets per Month;
water flushing pressure:0.6-1.2mpa;rated rotate speed:206r/min;

Product Description

 

MQT-130/2.8 
Parameter nameUnitParameter
Working PressureMpa0.5
Rated Torque N·m130
Rated Speedr/min206
Leg PropulsionkN5
ⅠⅠkN6.5
ⅠⅠⅠkN8
Maximum OutputkW2.8
Idle Rotate Speedr/min>=560
1/2Idle Rotate Speedr/min280
Max Loading TorqueN·m210
Air Consumptionm³/min4.5
Noise LevelSound Pressure LeveldB(A)<=95
Acoustic Power LeveldB(A)<=112
Feeding Strokemm740+-50
ⅠⅠmm720+-50
ⅠⅠⅠmm730+-50
Flushing Water PressureMpa06-1.2

 

  Product  Show

 

 

 

 

 

Certificate

 

Main Features

1. The   machine  is  small volume, light weight, simple operation, convenient maintenance of gear type pneumatic motor, running stability, high reliability of new glass fiber reinforced plastic pneumatic design, safety explosion-proof longer service life. 

2. Rock hardness f10 is mainly used in coal mine coal lane, rock bolt and anchor cable supporting drilling, and stirring and install the resin anchor rod, anchor rope, for with damping nut bolt, anchor drilling machine can be directly to tighten the nut when mixing, realize the bolt mixing, a complete installation, and meet the requirements of initial prestressing force anchor.

Packing

FAQ
 

Trade information:

1. Q: What’s the MOQ (minimum order quantity)?
A: One piece.

 

2. Q: What’s the best FOB price?
A: Our price is made as per your drawing specification as well as the purchasing quantity.

 

3. Q: What’s the lead time?
A: Normally, it takes around 60 days.

 

4. Q: Why the lead time is so long?
A: One gear part is made in around 20 machining processes. If every process takes 1 to 2 days, then it’s already at least 40 days. Not to say the forging and heat treatment time which take around 7 days min.

 

5. Q: What’s the payment term?
A: FOB Shanghai, paid by T/T. We will ask for down payment before production, and the balance paid off before shipment. Of course, we may also negotiate it.

 

6. Q: What kind of packing can you provide?
A: Tailor-made packaging method according to customer's requirement, otherwise, we will make the sea-worthy packing.

 

7. Q: Which countries have you exported?
A: Germany, Denmark, Spain, Holland, Italy, Japan, India, Indonesia, etc.

 

8. Q: How do you make sure the quality of your products?
A: We will do a series of inspections (includes: 1st pc inspection, self inspection, final inspection)
We will provide you the reports 1 set for each batch/ shipment.

 

Contact information

please contact us!

WhatsApp:+86 139 6165 8272 /+86 182 6150 3705

Mobile:+86 139 6165 8272 /+86 182 6150 3705

Wechat: 139 6165 8272 /  182 6150 3705  

QQ: 985139241

 

 

 

 

 

VIEW MORE