Roller material: | Cr12; | Feature: | High speed, low energy consumption; |
Supply Ability: | 30 Set/Sets per Month Galvanized Steel Sheet C U Channel Double Line Light Keel Roll F; | Production Capacity: | 25m-45m/ min; |
Power(W): | 6 kw; | Product name: | Used frame machine for sale; |
Work Pressure: | Normal Pressures; | Cutting type: | Hydraulic cutting; |
Frame material: | Middle plater weld; | Way Of Drive: | Gear; |
Voltage: | 380v 50hz 3phase; | Cutting blade material: | Cr 12 high grade steel; |
Packaging Detail: | 1. One 20ft container for loading one set machine with manual decoiler; 2. The whole Wiped Anti Rust Oil, PLC controller covered by foam film; 3. Spare parts and some small parts packed in plastic tooling box; 4. All Components Fixed by steel wire with Container.; | Control System: | PLC with touch screen; |
After-sales Service Provided: | Engineers available to service machinery overseas; | Brand Name: | Zhongtuo; |
Dimension(L*W*H): | 3500*1200*1400mm; | Condition: | New; |
Lanugage system: | Chinese ,English ,Russian (customized); | Weight: | About 3t; |
Type: | Steel Frame & Purlin Machine; | Certification: | CE; ISO9001; |
Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram,O/A; | Place of Origin: | Hebei China; |
Port: | Tianjin; | Warranty: | 1 Year; |
Shaft material: | 45# high grade steel; |
Machine Description | Quantity | Delivery time | Container Type | Price/ USD (FOB TIANJIN) |
c channel roll forming machine | 1 SET | 45 working days after receiving deposit | One 20GP | 7900---19900 |
Uncoiling→Feeding material into machine→Roll forming→Measuring length→ Auto cutting→Products receiving
Product name | Used frame machine for sale | |||
NO. | Items | Parameters | Remark | |
1 | Suitable Material | Type | GI/PPGI/AL |
|
|
| Thickness | 0.40-0.80mm |
|
2 | Product Specifications | Length | Any length |
|
|
| Length Tolerance | ±2mm/6m |
|
3 | Working Speed | 15- 25 m/min | Standard machine | |
4 | Control System | Mitsubishi/Siemens PLC& transducer | Custom | |
5 | Total Power | 6KW |
| |
6 | Total Weight | About 3T | Up to final design |
Components of Galvanized Steel Sheet C U Channel Double Line Light Keel Roll Forming Machine:
No. | Name | Unit | Qty |
1 | Manual decoiler | set | 1 |
2 | Main forming machine | set | 1 |
3 | PLC control system | set | 1 |
4 | Hydraulic pump station | set | 1 |
5 | Post cut | set | 1 |
6 | Electric motor | set | 1 |
7 | Output table | set | 1 |
Passive uncoil pulled by roll forming system
Loading capacity | Uncoiling width | Inner diameter |
1.5T | 300mm | 450-550mm |
Usage: Put the raw material(steel plate) through the beach to manufacture and process,it can guarantee that the prod
ucts are neat, parallel and everything is uniformity.
Usage: In order to keep the product shape and precision, adopts welded sheet structure, motor reducer drive, chaintransmission,roller was chromed which can keep the molding plate surface smooth and not easy to be marked when it is working Feature : Ensure stability , precision and lifetime.
No. | Main parameter of ceiling c channel forming machine | |
1 | Length of the main part | 3000*800*1400mm |
2 | Weight of main part | About 3 t |
3 | Voltage | 380V/50HZ3Phase (as customer's request) |
4 | Roller fixer | Guide column |
5 | Frame | Middle plate welded Memorial arch frame type |
6 | Frame thickness | 25mm |
7 | Drive mode | Gear or chain |
8 | Material of rollers | 45# steel with tempering |
9 | Material of shafts | 45# steel with tempering |
10 | Diameter of shafts | φ40mm |
11 | Number of rollers | 10 rollers |
14 | Main power | 3kw (Cycloidal planetary gear speed reducer) |
Advanced hydraulic drive, automatic punching and cutting after forming, no distorting or wasting, high level safety factor.
Blade Material | Cutting system |
Cr12 steel with quenched treated 60-62°C | Full automatic |
Screen | PLC | Coder |
Text screen displayer | Taida DVP14ES from Taiwan | Omron |
Orgin | Power |
Advanced hydraulic system from Taiwan | 3kw |
1. Installation and training:
a.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also tr
ain your workers/technician face to face.
b.Without visiting, we will send you user manual and video to teach you to install and operate.
C.If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary th
ings.
2. After Service:
a.One year guarantee for whole machine.
b.24 hours technical support by email or calling
c.If there is any problem found of the machine, we will repair it for free in one year.
Cangzhou Zhongtuo is a professional manufacturer and exporterwhich has its own
factory and also cooperate with several production factories and associated nterprises, concerning with the design,
development and production of cold roll forming machines,material of building. It is located in northwest of CangZh
ou, as a long history of cold roll formingmachine production base. All products comply with international quality stan
dards and are greatly appreciated in variety of different markets throughout the world, such as Asia, Africa, Europe,
South America, and Australia and so on.
1. Do you have after sales support?
Yes, we are happy to give advice and we also have skilled technicians available across the world.We need your machines running in order to keep your business running.
2. How to visit your company?
a.Fly to Beijing airport: By high speed train From Beijing Nan to Cangzhou Xi (1 hour), then we can pick up you.
b.Fly to Shanghai Airport: By high speed train From Shanghai Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
3. What can you do if the machine broken?
Our machine's warranty period is 12months,if the broken parts can't repair,we can send the new parts replace the broken parts freell,but you need pay the express cost yourself.if after warranty period,we can through negotiationfor to solve the problems,and we supply the technical support for the whole life of the equipment.
4. Can you be responsible for transport?
Yes,please tell me the destination port or address.we have rich experience in transport.
5. Why your price is higher than others?
As we persist on that each factory should put quality at the first place. We spend time and money on developing How to make machines much more automatic, accurate and high quality. We can make sure thatour machine could use more than 20 years without any problem. We can provide 2 years free qualityassurance.
6. How long the machine could be made?
Normally speaking, welded pipe making machine could be made without 45 working days. If you need machines in a hurry, we can make it for you less than a month.