Gasoline pile driver: | 52cc; | Fuel tank capacity: | 1L; |
Applicable Industries: | Machinery Repair Shops,Manufacturing Plant,Farms,Home Use,Construction works ; | Brand Name: | DY; |
Certification: | ISO; | UNIQUE SELLING POINT: | High operating efficiency; |
Starter system: | Hand pull start; | Piling Speed(m/min): | 2m/min; |
Efficiency: | high; | Condition: | New; |
Payment Terms: | T/T,Western Union; | Impact energy: | 25-45J; |
After-sales Service Provided: | Video technical support; | Max. drilling depth: | 2m; |
Application: | Hole Drilling; | Max torque and speed: | 1.45N.m/5000r/min; |
Diameter of Pile hole: | 30-150mm; | Dimension(L*W*H): | 20*60*40; |
Packaging Detail: | Standard export package; | Port: | Qingdao; |
Impact frequency: | 1700~2167BPM; | Warranty: | 1 Year; |
Advantages: | light; | Weight: | 23kg; |
Place of Origin: | China; | Supply Ability: | 500 Set/Sets per Month; |
The general gasoline and the two-stroke oil mix.
Work within 20hours (gasoline :engine oil)20:1
Work after 20hours (gasoline :engine oil)25:1
1.Prohibit the use of pure gasoline (no refueling two-stroke engine oil)for fuel
2.Well-ventilated place to add fuel.
3.Do not add too full fuel in the fuel tank. Do not leave fuel in the neck.If any fuel spill,please completely
remove or evaporate before starting the gasoline engine.
4.After refueling,tighten the fuel tank cap.