Suitable Casing: | 6-5/8,7,9-5/8; | Applicable Industries: | Energy & Mining; |
Model Number: | 5-1/2; | Working Tempreture: | 180 degrees Celsius; |
Type: | torque anchor; | Material: | 4140; |
Port: | Qingdao/Tianjin; | Min ID: | 76-90; |
Supply Ability: | 2000 Piece/Pieces per Month; | Max OD: | 121-230; |
Type: | torque anchor; | Weight: | 32; |
Connection Threads: | 3-1/2EU; | Payment Terms: | L/C,T/T,Western Union; |
Packaging Detail: | international standard wooden case or as per client's requirement; | length: | 690; |
Size: | 152,198; |
oil well down hole tools progressive cavity pump torque anchor
progressive cavity pump torque anchor contain the proven locking action of a cam with an improved separate slip activating mechanism. Extra bypasses allow for additional flow area and avoid sand bridging around the tool.
The progressive cavity pump torque anchor uses separate slip and drag blocks to eliminate premature slip wear during installation.
The drag blocks centralize the tool and provide the frictional interference to deploy the slips when torque is applied.
Casing Size(inch) | torque Anchor Body OD(mm) | Torque Anchor ID(mm) | Connection(inch) |
5-1/2” | 112.8 | 62.0 | 2-7/8EU |
6-5/8” | 138.4 | 62.0 | 2-7/8EU |
7” | 148.1 | 62.0 | 2-7/8EU |
9-5/8” | 215.9 | 76.0 | 3-1/2EU |
Dongying Zhaoxin Industry and Trade Co.,Ltd is an ISO-9001, ISO-14001, OHSAS-18001 certified company and has all the quality systems in place for design, planning,manufacturing and quality monitoring & traceability to ensure that Dongying Zhaoxin Industry and Trade Co.,Ltd products match the highest quality & reliability Standards similar to any International major in this field.
Dongying Zhaoxin Industry and Trade Co.,Ltd with perfect attitude, product and service, is going to make further development together with customers at home and abroad .
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T (HSBC bank) and Paypal, Western Union are the most usual ways we are using.
3) What’s the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 7-15days if we don’t have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.